logo
Shenzhen Jingji Technology Co., Ltd.

Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects

جزئیات محصول:
محل منبع: شنژن ، چین
نام تجاری: Top-King
گواهی: ISO9001:2008;RoHS
شماره مدل: HJ-1
پرداخت:
مقدار حداقل تعداد سفارش: 500 مجموعه
قیمت: قابل مذاکره
جزئیات بسته بندی: بسته بندی 250 عدد با هم در کارتن 300*250*152 میلی متر
زمان تحویل: 15 روز کاری با PO و سپرده
شرایط پرداخت: TT
قابلیت ارائه: 10000 عدد در روز

اطلاعات تکمیلی

مواد: CRS فولاد نورد سرد رنگ: مشکی
قطر: 28 میلی متر ضخامت: 23 میلی متر
کد سر: گرد کد HS: 7307990000
استفاده کنید: اتصال سیستم قفسه لوله ناب درمان سطحی: الکتروفورز
برجسته کردن:

budget metal pipe joints,cost-effective pipe rack system,HJ-1 pipe joint system

,

cost-effective pipe rack system

,

HJ-1 pipe joint system

توضیحات محصول

Product Overview

When pipe rack systems need to deliver maximum value per dollar invested, the HJ-1 Metal Pipe Joint is the component that makes a cost-effective system possible without sacrificing structural reliability or reconfiguration capability. The HJ-1 uses CRS cold rolled steel -- an economical material choice that delivers strong mechanical performance without the premium cost of stainless steel or aluminum alternatives. The black electrophoresis coating adds functional value at an economical price point: unlike expensive stainless steel, the electrophoresis coating on carbon steel provides adequate corrosion resistance for most indoor warehouse and manufacturing environments at a fraction of the material cost. The bolt-and-nut assembly system means no welding equipment, no specialized assembly stations, and no certified welders required -- costs that add significant overhead to pipe rack projects built around welded systems. The reusable nature of the HJ-1 system also means the total cost of ownership over a 10-year period is typically lower than welded systems, because the initial investment is recovered when the system is reconfigured rather than discarded.

Technical Specifications

Parameter

Specification

Item Model

HJ-1

Material

CRS Cold Rolled Steel

Color

Black

Surface Treatment

Electrophoresis

Thickness

23 mm

Combination

HJ-1 = 2pcs H-1 + M6x25 bolt and nut set

Installation

Single M6 inner hexagon key for assembly

Reusability

Fully reusable -- pipes and joints can be disassembled and reconfigured

Pipe Compatibility

Suitable for standard pipe rack systems with 23mm pipe wall thickness

Finish

Electrophoresis coating -- wear-resisting, bright luster, pollution-free

Structure

Bolted and nut fastening -- easy assembly and disassembly without special tools

Application

Industrial storage, logistics equipment, workstation, production line, commercial display

Key Benefits

· CRS cold rolled steel at economical cost -- cold rolled steel provides the structural strength required for pipe rack applications at a significantly lower material cost than stainless steel or aluminum, without the quality trade-offs of hot rolled steel

· Electrophoresis coating for cost-effective corrosion protection -- electrophoretic coating on carbon steel provides adequate corrosion resistance for most indoor industrial environments at a fraction of the cost of stainless steel, with better corrosion resistance than paint or powder coating

· No welding equipment or certified labor required -- the bolted assembly system eliminates the significant capital and labor overhead associated with welded pipe rack fabrication, reducing total installed cost substantially

· Complete HJ-1 kit reduces procurement complexity -- each HJ-1 ships with the two H-1 joints and M6x25 hardware required for full assembly, eliminating the common problem of partial shipments that delay installation

· Lower total cost of ownership over system lifecycle -- the reusable bolted joint design means the investment is recovered at every reconfiguration rather than being written off as a permanent structure, delivering better ROI over 5 to 10 year planning horizons

Applications

Cost-sensitive warehouse storage racking, budget-conscious production line construction, contract manufacturer facility fit-outs, start-up manufacturing operation infrastructure, educational and training facility workshop installations, and any application where the total project budget is constrained but structural performance requirements remain non-negotiable. The reusable nature of the system is particularly valuable in start-up and early-stage manufacturing operations where the initial layout is likely to change significantly as the business scales, and where capital preservation across layout changes matters more than the lowest possible first-cost installation.

Why It Works

The cost effectiveness of the HJ-1 system is not simply a matter of low component price -- it is the result of a design philosophy that optimizes for total installed cost and lifecycle value rather than first-cost minimization. The CRS cold rolled steel material is chosen deliberately: it has the strength and machinability needed for the application without the material premium of higher-grade steels. The electrophoresis coating is applied electrostatically in a controlled bath, which is a highly efficient coating process that uses material very efficiently compared to spray or brush application methods -- this efficiency translates directly into a lower coating cost per part. The bolted assembly system is where the most significant cost savings are realized compared to welded alternatives: in a typical warehouse racking project, the welding equipment, certified welder labor, welding consumables, weld inspection, and post-weld finishing together can represent 30 to 40 percent of the total installed cost of the racking. The HJ-1 eliminates all of these costs by using mechanical fastening, which any trained worker can perform without specialized certification. The reusable bolted design then compounds this advantage over the system lifecycle: a welded rack that needs to be reconfigured after three years typically requires cutting and re-welding, at a cost comparable to the original fabrication. The HJ-1 system simply gets disassembled and rebuilt at the new configuration, at a labor cost roughly equivalent to the original assembly.


Combination:


one HJ-1 is combine with 2 pcs of H-1 ,and one set of M56*25 nut and screw 


Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects 0Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects 1

Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects 2


Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects 3Cost Effective Pipe Rack System - HJ-1 Metal Pipe Joints for Budget-Conscious Projects 4

Why choose our products?
1) We are direct manufcture of pipe rack system, we produce all series of material for pipe rack system, such as metal joint, plastic joint, lean pipe, roller track, accessory for pipe rack system.

2) We produce this serises products metal pipe joint for more than 10 years, the earliesr factory to produce pipe rack system in Cina.

Our Company
Shenzhen Jingji Technology Co., Ltd.(TOP-KING HK LIMITED ) Is a professional manufactuer for design, production and sale of industrial storage equipment, flexible production equipment, automation equipment and other kinds of instruments and gauges. beside, the company distributes anti-static peripherals.

We provide a comprehensive logistics plan in order to avoid waste of resources in course of purchase and supply chain by manufactures. It is our ultimate goal to provide all customers with full service, to meet exact demands of customers. To improve product quality, and to enhance customer satisfaction storage annd logistics as in automation industy.

امتیازها و بررسی‌ها

امتیاز کلی

5.0
بر اساس 50 بررسی برای این تامین کننده

عکس درجه بندی

در زیر توزیع تمام امتیازات است.
5 ستاره‌ها
100%
4 ستاره‌ها
0%
3 ستاره‌ها
0%
2 ستاره‌ها
0%
1 ستاره‌ها
0%

تمام بررسی ها

L
Lok
Malaysia May 14.2025
good product
با ما در تماس باشید

وارد کنید پیام شما

شما ممکن است در این مورد باشید