|
جزئیات محصول:
|
|
| محل منبع: | شنژن ، چین |
|---|---|
| نام تجاری: | Top-King |
| گواهی: | ISO9001:2008;RoHS |
| شماره مدل: | HJ-1 |
|
پرداخت:
|
|
| مقدار حداقل تعداد سفارش: | 500 مجموعه |
| قیمت: | قابل مذاکره |
| جزئیات بسته بندی: | بسته بندی 250 عدد با هم در کارتن 300*250*152 میلی متر |
| زمان تحویل: | 15 روز کاری با PO و سپرده |
| شرایط پرداخت: | TT |
| قابلیت ارائه: | 10000 عدد در روز |
|
اطلاعات تکمیلی |
|||
| مواد: | CRS فولاد نورد سرد | رنگ: | مشکی |
|---|---|---|---|
| قطر: | 28 میلی متر | ضخامت: | 23 میلی متر |
| کد سر: | گرد | کد HS: | 7307990000 |
| استفاده کنید: | اتصال سیستم قفسه لوله ناب | درمان سطحی: | الکتروفورز |
| برجسته کردن: | industrial pipe rack system,metal pipe joints storage,HJ-1 pipe rack solution,metal pipe joints storage,HJ-1 pipe rack solution |
||
توضیحات محصول
A pipe rack system is only as reliable as its weakest connection point, and the HJ-1 Metal Pipe Joint is engineered to be that reliable foundation. Designed specifically for 23mm wall thickness pipe rack pipe, the HJ-1 uses a precision machined CRS cold rolled steel body with a black electrophoresis finish to deliver a connection that is structurally sound, corrosion-resistant, and -- critically -- reusable when system configurations need to change. The HJ-1 arrives as a complete kit: two H-1 joint bodies plus the M6x25 hardware required for full assembly, so there are no missing fastphens or compatibility issues at installation. The bolted connection mechanism uses the M6 hardware to create a clamp-style joint that captures the pipe from both sides -- a double-sided clamping configuration that distributes loading forces more evenly than single-clamp alternatives and reduces stress concentrations at the pipe wall.
|
Parameter |
Specification |
|
Item Model |
HJ-1 |
|
Material |
CRS Cold Rolled Steel |
|
Color |
Black |
|
Surface Treatment |
Electrophoresis |
|
Thickness |
23 mm |
|
Combination |
HJ-1 = 2pcs H-1 + M6x25 bolt and nut set |
|
Installation |
Single M6 inner hexagon key for assembly |
|
Reusability |
Fully reusable -- pipes and joints can be disassembled and reconfigured |
|
Pipe Compatibility |
Suitable for standard pipe rack systems with 23mm pipe wall thickness |
|
Finish |
Electrophoresis coating -- wear-resisting, bright luster, pollution-free |
|
Structure |
Bolted and nut fastening -- easy assembly and disassembly without special tools |
|
Application |
Industrial storage, logistics equipment, workstation, production line, commercial display |
· Complete kit delivery -- HJ-1 ships with both H-1 joints and M6x25 hardware, eliminating the common problem of receiving structural hardware without the fasteners needed to complete assembly
· 23mm pipe wall compatibility as standard specification -- the HJ-1 is designed specifically for the 23mm pipe wall thickness that is the standard for industrial pipe rack applications, ensuring dimensional fit without custom shimming or modification
· Double-side clamping joint geometry -- the two H-1 joints in each HJ-1 create a symmetrical clamping configuration that distributes mechanical loads more evenly and reduces stress concentrations at the pipe wall interface
· CRS cold rolled steel with electrophoresis -- the same material and coating specification used in demanding industrial environments, providing the combination of structural strength and corrosion resistance that pipe rack systems require
· Reusable for system lifecycle management -- unlike welded systems that are permanently assembled, the HJ-1 can be disassembled and the joints and pipes redeployed in new configurations, extending the useful life of the material investment across multiple facility layouts
Complete pipe rack system construction for warehouses and distribution centers, production line structural framing, industrial storage racking, mezzanine and platform support structures, conveyor support frames, and machinery guarding frames. The reusable nature of the HJ-1 system makes it the preferred choice for third-party logistics operators and contract manufacturers who may need to recover and redeploy their racking infrastructure at the end of a contract term, and for any facility that is actively managing its layout as part of a continuous improvement or operational excellence program.
The engineering of a bolted pipe rack joint involves a subtle but important trade-off between clamping force and pipe wall integrity. The HJ-1 manages this trade-off through its two-piece H-1 clamping design. When the M6 bolt is tightened, both H-1 joints draw together against the pipe from opposite sides, creating what engineers call a 'double shear' loading condition at the fastening point. Double shear is significant because it roughly doubles the load-carrying capacity of the connection compared to a single-sided clamp -- the force is distributed across two cross-sectional areas of the fastener rather than one. The CRS cold rolled steel substrate is important here because cold rolling produces a finer, more consistent grain structure than hot rolling, which means the threads on the M6 hardware engage cleanly in the joint body without cross-threading and maintain their preload under vibration and dynamic loading. The electrophoresis coating contributes to this by maintaining a consistent coefficient of friction at the joint interfaces -- the coating does not compress or cold-flow under clamping load the way polymer-based coatings can, so the joint maintains its tightening specification over repeated assembly and disassembly cycles.
Combination:
one HJ-1 is combine with 2 pcs of H-1 ,and one set of M56*25 nut and screw
![]()
![]()
![]()
![]()
![]()
امتیازها و بررسیها
وارد کنید پیام شما
امتیاز کلی
عکس درجه بندی
در زیر توزیع تمام امتیازات است.تمام بررسی ها